Bavaria 390 Caribic - 4 for sale
€ 38,900
VAT incl.
New
Details
Designer
Axel Mohnhaupt
Year built
1990
berths
8
Location
Netherlands, Aan Verkoopsteiger In Lelystad
Category
Technical data
Length
12.15 m (40 feet)
Beam
4 m (13.1 feet)
Draught
1.80 m (5.9 feet)
Clearance
18 m (59 feet)
Max. headroom
1.85 m (6.1 feet)
Hull material
GRP/polyester
Hull colour
white
Displacement
ca. 8,000 kg
No. of showers
1
Water tank
190 ltr
Fuel tank
190 ltr
Material
aluminium
engine
Propulsion
sail drive
Model
Volvo Penta 2003 T
Power
43 hp (32 kW)
Engine type
inboarder
Year built engine
1990
Fuel
diesel
Engine hours
ca. 1,629
Number of cylinders
3
Sails
Keel type
fixed keel
Ballast
3,000 kg
Equipment
anchor (Ploegschaaranker van 16 kg), battery (Startaccu: 12 V, 95 Ah
Service: 2 accu’s: 12 V, 105 Ah, deepcycle. Jaar: 2024), battery charger (Victron energy, blue smart charger, 12 V, 30 AMP, 3 output. Jaar: 2024), position lights (Alle verlichting in 2024 vervangen voor led-verlichting: ankerlicht, toplicht, dek/stoomlicht, heklicht en boeglicht. Stoomlicht is niet aangesloten), pressurized water system, shore supply 220V (In 2023 nieuwe RVS walstroomaansluiting gemonteerd, zijn er nieuwe kabels getrokken, een zekeringskast gemonteerd en is het 230 V-systeem getest), voltmeter, warm water system (25 liter, op walstroom en wanneer de motor draait)
bathing ladder (stainless steel), bathing platform, fenders, guard rail (RVS scepters in RVS scepterpotten), teak deck
heating (Webasto, werking onbekend.), hob (gascomfoor, type A. Gaskeuringscertificaat uit 2023), refrigerator (Toplader)
radar reflector (Osculati Radar reflector RAY Mirror (is nog niet opgehangen))
genoa (North sails), roller-furling jib (Harken), mainsail (North sails)
This text has been translated automatically.
In 2023 an extensive osmosis treatment of the underwater hull was carried out: blasting, polyester repairs, 7 layers of primer, filling, fairing and finishing the waterline. Carried out by Modus Marine
In 2024 the sail drive oil (2.5 l) was renewed and a zinc anode fitted.
Engine check 04-07-2024: good check; air filter cleaned, intake cleaned/brushed, turbo freed up. In 2024 the fuel hoses were replaced and the oil/filter, Separ pre-filter, fine filter, coolant, V-belt and impeller were replaced/checked.
Upholstery of the saloon seat cushions recently replaced
All through-hull fittings were replaced in 2024
In 2024, among other things, the steering gear, depth transducer and VHF antenna were adjusted.
2024, incl. mast inspection and standing rigging replaced excluding rigging screws; mast full service, rigging up and tuning.
Roller furling cover
In 2024 the sail drive oil (2.5 l) was renewed and a zinc anode fitted.
Engine check 04-07-2024: good check; air filter cleaned, intake cleaned/brushed, turbo freed up. In 2024 the fuel hoses were replaced and the oil/filter, Separ pre-filter, fine filter, coolant, V-belt and impeller were replaced/checked.
Upholstery of the saloon seat cushions recently replaced
All through-hull fittings were replaced in 2024
In 2024, among other things, the steering gear, depth transducer and VHF antenna were adjusted.
2024, incl. mast inspection and standing rigging replaced excluding rigging screws; mast full service, rigging up and tuning.
Roller furling cover
Description
This text has been translated automatically.
Between 2022 and 2024 a great deal of work was done on the boat. The underwater hull was sanded, after which polyester repairs were carried out. The underwater hull was then filled and given seven layers of primer. The keel was removed, the keel attachment was relaminated, the keel surface was repaired and the aft frame was reinforced. The keel plates and keel bolts were also replaced.
The rudder has been removed and fitted with a new bearing. The engine and sail drive have had an extensive service, and all through-hull fittings have been replaced. In addition, a new shore power connection and fuse box have been installed, and all exterior navigation lights have been renewed. A new speed log, depth sounder, VHF radio and autopilot have also been fitted.
In addition, a new blackwater tank with gauge and piping has been installed. Various leaks have been addressed, the transom has been repainted, the mast has been inspected and the gas installation has also been checked. The chainplate fittings on the side decks have been removed, the deck was checked and the fittings were then refitted. Furthermore, a new remote control for the anchor windlass has been installed and the standing rigging has been renewed.
In 2026 a new toilet was installed.
As far as we are aware, there are a few points of attention. There is a crack near the access hatch. The water tank in the forepeak is probably leaking at a pipe, and the forepeak is not yet fully finished with panelling. There is a leak at the steering column. The steaming light still needs to be connected; the preparation for this has already been done. On the hatches of the anchor box and the fender box, the wood is crumbling on the underside. The bilge pump in the wet cell works, but does not switch off automatically.
The rudder has been removed and fitted with a new bearing. The engine and sail drive have had an extensive service, and all through-hull fittings have been replaced. In addition, a new shore power connection and fuse box have been installed, and all exterior navigation lights have been renewed. A new speed log, depth sounder, VHF radio and autopilot have also been fitted.
In addition, a new blackwater tank with gauge and piping has been installed. Various leaks have been addressed, the transom has been repainted, the mast has been inspected and the gas installation has also been checked. The chainplate fittings on the side decks have been removed, the deck was checked and the fittings were then refitted. Furthermore, a new remote control for the anchor windlass has been installed and the standing rigging has been renewed.
In 2026 a new toilet was installed.
As far as we are aware, there are a few points of attention. There is a crack near the access hatch. The water tank in the forepeak is probably leaking at a pipe, and the forepeak is not yet fully finished with panelling. There is a leak at the steering column. The steaming light still needs to be connected; the preparation for this has already been done. On the hatches of the anchor box and the fender box, the wood is crumbling on the underside. The bilge pump in the wet cell works, but does not switch off automatically.
Your email has been sent.
€ 38,900
VAT incl.
Your email has been sent.