Case to be seized with restoration work
We liked it: A spacious interior in good condition upholstery and varnish
Work to be done: Exterior upholstery to be redone,
Engine overhaul to be done namely: Valve, injector, water pumps, alternator, injection pump, heat exchangers, elbows, leaks to horn sumps, overhaul of bases. Non-exhaustive list
Staging and technical:
Engine Alarm, Water pressure pump, Special Colour (Bleue), Teak Cockpit, Shorepower connector, Outboard Engine Support Bracket.