Rudder and leeboards are in epoxy, then 2-component paint.<br />
Windows were installed in 2006, the hull was sandblasted in 2006 and put in a two-component system.<br />
<br />
Engine has had annual maintenance, oil, impeller, etc have always been replaced.<br />
<br />
An electric mast lowering winch was installed in 2021. It is now very easy to lay the mast flat.<br />
The rigging was replaced in 2018, spars were varnished in 2021, hood and jib are from 2017.